Bedroom 2

This room is sadly neglected. It is upstairs on the church end of the house and is awaiting a lot of work being done to it to bring it up to date. The Velux window has been replaced and other people's clutter has been replaced with our clutter. 

Two granddaughters have used it when it has been cleared out before, as has a brother but it is back to being a clutter as we are trying not to use the eaves to hide boxes away and then forget they are there. Once all the work has been done and the boxes unpacked this should be a lovely room.

What does it need? It needs a view out to the Kyles for a start. It has a window looking out to the church, nice enough but needing replacing as really old double glazing. It needs heating as old storage heater. It has had a new Velux window looking out to the garden at the rear. It needs the darkroom next door, also a storage cupboard, being knocked into it and it also needs the upstairs shower room to be made into Ensuite 2 to be used when this room is in use. 

We had thought about putting a balcony overlooking the shore on this room but the cost of everything has so increased that we are not doing the lounge extension so there is no roof to put a balcony on. We then thought about Velux windows out to the front but our builder reckons a dormer window, like on Bedroom 1, would make the house more symmetrical and would not cost much more than the Velux windows we were planning.

Watch this space!

Before clearance

Other people's clutter

The old Velux window

Our clutter with the new Velux window in place